belljr
Footballguy
This is going to be a dumb question but wanted some thoughts based on processing speed.
So basically if you have 120 reduced to 60. That's a 50% decrease.
So a basic example would be this...
Job 1: Took 120 minutes to complete
Job2: Took 60 minutes to complete
Would you say this means Job2 runs 50% faster or is there some other formula for calculating this
So basically if you have 120 reduced to 60. That's a 50% decrease.
So a basic example would be this...
Job 1: Took 120 minutes to complete
Job2: Took 60 minutes to complete
Would you say this means Job2 runs 50% faster or is there some other formula for calculating this
Last edited by a moderator: