I'm attempting to level out my concrete floor in garage, to renovate for new living space. There is about a 3" difference between high point and low point. I have the option of pouring over the old concrete and feathering out, and having the ceiling height be about 6' 9", or taking out the existing slab, and starting over, and building up to 7".
I've heard conflicting information whether or not old concrete and new concrete will bond, and if the concrete that feathered out less than 3" on top will crack.
The difference between pouring over or starting from scratch is about $700.
Anybody in the profession, or with experience care to lend an opinion?
I've heard conflicting information whether or not old concrete and new concrete will bond, and if the concrete that feathered out less than 3" on top will crack.
The difference between pouring over or starting from scratch is about $700.
Anybody in the profession, or with experience care to lend an opinion?