All sponsors $ in
All Pre-Fest Prep and #### paid for... 3000 sq of carpet, $3000 on tent/table/chair rental, 3 full size ice refrigerators rented, 4 porta-potties rented, 45,000lbs of scaffolding and plywood ordered and being loaded on trucks in a couple weeks, 200 Amps of 220V power service to our custom built electrical panel. $75,000 light and sound system going in with intelligent lighting, 3 audio zones, 4 massive dual 18" sub cabinets, laser modules, multiple flat screens including directTV feed and 4G Wifi Service. $50k damage insurance on the system, plus $2MM Liability policy over the whole booth.
• Loading the PODS April 26-28th
• Scaffold Build May 4-6th
• Labor laying carpet May 7th and helping unload large items from PODS. Light booth setup that day
• Wed May 11th AM picking up 24 Lagunitas kegs, then 1000lbs of meat/food from BB Kings on Beale, then trailering into park and labor will load kegs/food into refrigeration
• Wed May 11th PM: Team finish setting up booth (hanging lights, banners, decor, stocking bar, tapping kegs, cooking team dinner that night
We have a
professional high-end wedding videographer shooting the event this year.
• Mounting mutiple GoPros to scaffold for time lapse footage
• Shooting high frame rate 1080p in booth for flexibility in speeding/slowing footage in post production
• Bringing 4K video drone for aerial footage of booth/festival day or night.
• DAY: Shooting food prep, cooking, team hanging out, live music, People eating/drinking, arial footage of booth/festival, etc
• NIGHT: Shooting folks dancing, DJs spinning, Insane light show in booth, arial footage of booth/festival.
Will likely be broadcasting
live via Facebook Page and maybe Periscope periodically through the event if anyone wants to follow along. Definitely follow FB and
Twitter for regular updates.